+7 (495) 642 37 14

+7 (701) 786-56-28

+996 (312) 655 277

Tanks for liquefied hydrocarbon gases (LHG)
with volume 1.0-200M3

  • Aboveground or underground construction
  • Maximum permissible working pressure up to 2.5 MPa
  • Service life over 20 years
  • Easy installation
  • Delivery within the CIS
*Manufactured in accordance with ГОСТ Р 52630-2012 \ ТР ТС – 032/2013
Fill the form and we will contact you as soon as possible.

Range of use:

End-users’ storage. These include populated areas, large industrial enterprises, group installations for feeding cottage communities;
Storage facilities for gas peak-consumption stations (that is, stations whose main task is to smooth the unevenness of gas consumption);
Storage based on gas and oil refining factories (gas and oil refinery);
Storage of gas-filling stations

technical specifications

ITEM LHG
LHG 5 10 20 25 50 100
Operating temperature °С -40...+40 -40...+40 -40...+40 -40...+40 -40...+40 -40...+40
Operating temperature   Steel 09Г2С Steel 09Г2С Steel 09Г2С Steel 09Г2С Steel 09Г2С Steel 09Г2С
Location   Floor-mounted Floor-mounted Floor-mounted Floor-mounted Floor-mounted Floor-mounted
Outer corrosion-resistant coating   Ground, enamel Ground, enamel Ground, enamel Ground, enamel Ground, enamel Ground, enamel
Hazard class under the State Standard (GOST)   Class 4 Class 4 Class 4 Class 4 Class 4 Class 4
Dimensions Length mm 4700 5400 10300 8350 11500 14700
Diameter mm 1220 1620 1620 2030 2430 3050
Height mm 1720 2150 2150 2580 2980 3590
Filling level % 85 85 85 85 85 85
Weight kg 1600 2900 4800 5850 10850 19600

Reviews

JSC «RZD»
Task:
Requirement in hot-water boilers with high with high efficiency for heating up administrative buildings.
Rezult:
We manufactured energy-independent fire-tube boilers, what allowed to reduce expenses of solid fuel and electricity.
Plant «Coca-Cola Uzbekistan»
Task:
Requirement of high-quality steam boilers in short terms.
Rezult:
We manufactured several steam boilers with steam generating capacity from 2 000 kg/h to 3 000 kg/h with full equipment, what allowed to economize expenses and accelerate manufacturing.
BP «Aksay - NAN»
Task:
Requirement of replacing old equipment with new and modern fire-tube steam boiler.
Rezult:
We manufactured three steam boilers, what helped to continue manufacturing without stopping.
JSC «Gasprom-Bitum»
Task:
Requirement of economic equipment for heating up heavy oil with long - term service.
Rezult:
We manufactured fire-tube steam boiler «TANSU» with steam generating capacity 6 000 kg/h; what helped to lower expenses and accelerate the work.

Video materials

Get the current price list and product specifications